Offsite manufacture, assembly and testing of modules to form a complete modular build of a major infrastructure upgrade at a UK pharmaceutical site. This major project was carried out at McEvoy Engineering’s dedicated modular fabrication facility.
Scope included
McEvoy Engineering’s ability to undertake constructability reviews of the client design concept played a pivotal role in resolving design challenges throughout the project.