Manufacture and installation of 40m cable bridges for electrical infrastructure project at a major UK nuclear processing site. Scope included design of end connection calculations and production of fabrication drawings.
RELEVANT TECHNICAL DETAILS:
Stringent QA compliance and inspection regime to nuclear sector expectations - full material traceability, procedural control, inspection and test plans and lifetime record packs.